Our Milestones

2016
2015
2014
2013
2012
2010
2009
2008
  1.  Completed Ibigwe 7 well workover
  2.  Completed Ibigwe 6 well workover
  3.  Received DPR approval for Detailed Engineering Design (DED) for the 5000bpd modular refinery
  4.  We emerged as the preferred bidder of TURACO (Deep & Shallow) block in the Uganda first competitive  licensing round
  5.  Acquisition, Installation and Commissioning of 4MMscf/d gas lift compressor for enhanced crude oil  production
  1. Commenced the third drilling campaign to drill IB 9 & 10 as well as IB 4 workover
  1. Completed Ibigwe Field re-evaluation to determine new field development plan
  2. Acquired Trans Electromagnetic Sounding system (TEMS) for the further studies of Ibigwe field
  1. Secured and reprocessed 3D seismic vintage of Ibigwe field
  1. Completed Second drilling campaign attained 5000 bpd
  2. Upgraded Flow station capacity to 15,000 bpd
  3. Participated in the ND western consortium that made a successful bid to acquire 45% interest in OML34 which was divested by Shell/Total/Agip JV
  1. Installed Compressor for gas lift purposes–ramped production to 2,200 bpd
  1. Completed first drilling campaign and attained 1,800 bpd
  1. Commenced commercial export from Ibigwe Field